Folks;
Currently we are in the process of upgrading to ECC6 from ECC5. We have run into a major problem in the Subcontracting PO process that could potentially be a project killer.
Currently on our ECC5 system we generate many Subcontracting (SC) POs with multiple materials on each PO.
When we run the ME20 SC Monitor and select (lets say 10 materials) and click on the Create Delivery button, we get one delivery with 10 (or more if there are batch splits due to Batch Determination) lines for the material selected.
Our ECC6 system has been loaded with recent data from our production system and all code/configuration has been updated. Now when we process the ME20 Monitor and select multiple materials the system is generating one delivery per material! This will not work for our company at all.
We have been searching websites for this issue and notes (namely 399912 and 546668) and even have run the ZLE_ANALYZE_DELIVERY_SPLIT report to see what the problems are. Nothing has lead us to any answers.
All Material Master data is identical between the ECC5 and ECC6 systems. All Vendor Master information is identical. All Vendor Info Records are identical. The Shipping Copy Controls are identical (the SAP Standard for LB Delivery type).
Can anyone tell us where in ECC6 are Delivery Splits being controlled from? Is there some new configuration in ECC6 about delivery splits? Is there new Master Data hidden somewhere?
For us, if this can not be solved, our Logistics VP could (and probably would) put an end to our upgrade.
Thanks you in advance.