Serial Number Error During Goods Receipt of Refurbishment Order.

$
0
0

Hi All,


User is trying to process the remaining steps of two PM orders 9000383 and 9000384 but system does not allow him/her. Actually serial # activated for the this material in Dec, 2014 and these PM orders created in Oct, Nov, 2014.



Error at the time of GR for Refurbishment Order is: Maintain Serial Number for Total Quantity.


Best Regards,

Malik Irfan Ahmed


MBEW Material valuation but in group currency

$
0
0

Hi,

 

Is there any table showing the inventory values/prices in group currency rather company code currency?

I know CKMLCR but the thing is that if a material is not valuated (no costing run for that material) at the selected period then the inventory price does not show in the table for the period even there is stock for mentioned material.

But in MBEW and also S_P99_41000062 it retrieves the inventory value with the latest PUP (e.g. maybe last costing run in 3 months ago).

So I wonder if there is such a table to use?

 

Thanks in advance!

Issue with PR to PO conversion with t-code: ME59N but same PR is converted to PO with t-code: ME59

$
0
0

Hi Experts,

 

We are getting the error "Net price must be greater than 0" Error message: 06 218 while converting PR to PO using t-code: ME59N. The same PR is getting successfully converted to PO via t-code: ME59.

 

All master data settings are maintained

1. Vendor Master & Material master- Auto PO tick OK

2. Source List maintained OK

3. Info-record for material-vendor combination maintained OK

4. Condition maintained OK

 

Also, I have tried creating the PO using the same PR via ME21N and did not get any error. PO was created successfully.

 

I have checked SCN and could not get requisite link which answer my query. Any inputs/pointers will be helpful.

 

Thanks,
Sandeep

How to delete AB confirmation from PO

$
0
0

Dear  colleagues, I have PO which items are confirmed with confirmations AB. This confirmations are mistake and I want to delete them from PO. Could you help me how to do it? Regards, Harry

SLED is changed automatically while doing MIGO, message no. 12006

$
0
0

Dear gurus,

 

I do not want system from changing  SLED / expiry date automatically while doing good receipt through MIGO.

where to disable to this automatic recalculation, please guide.

 

In Purchase order we are using shelf life exp. date only for printing purpose ( message No. 12006 & 12007 was changed to Warning msg.)

 

Regards

Rammohan

Shelf Life is automatically changing in T code MIGO

$
0
0

Hiiiii.....

 

Existing SLED (30.11.2014) has been changed to 30.11.2016 by the program

 

This warning message comes when we are doing GR with T code MIGO.

Suppose Material A has 12 month of expiry.

When we do GR and put Vendor batch and Manufacturing date in MIGO let manufacturing date 01.01.2015 and expiry date 30.06.2015. System should take 31.12.2015 with warning message. This is true…

 

But here this is taking 01.01.2016 (one month excess).

 

When you enter 01.12.2014 It should take 30.11.2015 but it is taking 31.12.2015 why it is taking one month excess.

 

Please see screen shot also in attachment.

why still some industries procuring IM &Services through non-SAP why not thru SAP? it is not a question, its debate only ..opinion!!

$
0
0

Hi SCM /MM Consultants,

 

Query "Why still some of the industries procuring Indirect Material &Services through non-SAP such as Ariba, SSS, Coupa, etc."

 

- As it is observed that some of the industries they are going for non-sap system when it comes to Indirect materials purchases such as office and sales general materials and also service procurement such as contractor, tax consulting, etc.

- what is the main reason that tends them to go for non-sap where interface comes into picture with sap.

 

pn: ariba is part of sap, but still it is not purely in sap, but we can do im&s in sap.

 

Thanks,

Srin

multiple PO's process

$
0
0

HI GUrus,

 

Can anyone please throw some light on this scneario on how we can streamline this a little bit.

 

Current process: we do all third party/subcontracting combination tpye of purchases. we get a sales order from our customer for Material A. Material A is based of material B and material C. So we create a third party PO for material A against a vendor1 with delivery address to customer. Now how does the vendor1 get material B and C, we create another two PO's separately each against Vendor2 and vendor3 for material B and C respectively. Was there a better way of doing this?

 

Also some times our buyers want to inform the vendor2 and vendor3 much well in advance so that they can produce the materail and ship to vendor1 so that vendor1 can finish the material A in time and ship to customer. So what happens is when our sales directors and customer service folks interact with customers and find out informally that we are going to get sales orders from them, our buyers immeditaely create PO for material A and when the true sales order arrives, they cancel the existing PO and create a PO based off of sales order.

 

OI'm thinking there must be better ways of doing htese things..

 

can anyone throw some light

 

thanks

Ravi


why inbound deliveries still is open after goods receipt???

$
0
0

hi every body

I take a report about open inbound deliveries by this way :

VL06I > for goods receipt

Capture5.JPG

after take a report I knew that all of the inbound are in the report .

for example :

Capture.JPG

Capture.JPG

 

inbound 180010651 was receipted

 

Capture2.JPG

why inbound deliveries still is open after goods receipt???  all of the inbound that receipted are in status of open ????

standard purchase organization

$
0
0

Hi

 

 

please explain  me what is standard purchase organization.

why mb90 dosen't work with other language ??

$
0
0

hi every body

our language is persian . end users for print Repeat used mb90 . 2 weeks age they can't do print . they have NDR parameter

Capture4.JPG

but when I change the default of date to EN  it is possible .look at these :

Capture.JPG

error message : no message for repeat processing exist

Capture3.JPG

when i change it to :

Capture.JPG

Capture.JPG

Capture.JPG

please guide me .what can i do???

dependent requirements not clearing up

$
0
0

Hi gurus,

I was wondering if someone could throw some light on this strange behavior. I tried to check all settings and it did not make any sense to me. we have a material A and material B. material A is the component in the BOM of Material B. We get sales orders for material B. I see in the document flow of sales order of material B that it was PGI'ed yesterday and we have MRP job NETCH that runs everynight. I do not understand why the MRP element with CUS ORD still shows up in MD04 for material B and as a result the dependent requirements also shows up for material A in MD04. what could be the problem. Oh and by the way we use strategy group of 52 on the material master for B.

 

Any ideas?

 

Thanks

Ravi

Purchasing Release Strategy - an expanded explanation and a GPS through SCN and SAP notes

$
0
0

Customizing of a release strategy in MM  seems to be the final exam which separates the wheat from the chaff.

No doubt that many struggle at this hurdle, 6500 discussions in MM are evident. 4.5% of all MM content. And it is known that this topic is discussed in Retail, ABAP, ERP and some other spaces too.

 

What makes it so tough?

Is it the number of steps to be executed?

Is it because knowledge on classification is needed?

Is it because of the mix between customizing and master data (classification, cost center...)?

Is it lousy documented by SAP in help.sap.com  or by other users in wikis, blogs and documents?

Is the request not well defined by the business?

Is it too complex because of its flexibility with user exits

is it just too abstract for self-education?

 

You are invited to share your personal answer in the comment section.

 

 

I personally miss words, in particular as answer to the question WHY ...?

SAP uses quite a lot words and almost no pictures to explain the process and customizing in help.sap.com

The bloggers and tutors in SCN often use only pictures and outline just what SAP had put in words, but also miss to explain beyond.

 

The self-educators can just follow this one illustrated process, but in the moment the business requirement is a bit different they fail because they never understood the connections, were not able to abstract the shown process enough to get it linked with their own requirement.

I have to admit, the Airline processes for ABAP education is disconcerted to me too. It could have been half as tough for me if they had talked about material master, vendors and other MM tables.  So I had to make two hops instead of just one to apply the training to my personal requirements. I am already curious how our key users do when they need to test with anonymized data in near future. As you see it can hit you everywhere, you will rarely find a 1:1 match to the things you learned, you need to understand it to make it work for you with variations.

 

I will not repeat the whole setup process here again, instead I will focus on the things that I miss in the existing content of wikis, documents and blogs, and put links to this content, so that this blog can work as a map and navigate you to the right stuff for particular requirements.

 

Before we even start with customizing we either get a requirement from the business, or we are proactive and "sell" it to the business by explaining the advantages and telling them why they need it.

 

WHY do we need a release strategy for purchasing documents?

 

People do (can) not trust each other. The NSA is spying Mrs. Merkels cell phone,  Google all of us. And not really different in the micro cosmos of a company.

 

Bosses do not trust their employees, have no trust that they perform their job within the given rules, need a controlling mechanism, like SCN has moderators to control that people do not post the 6501st question on release strategy without doing any research by themselves before.

 

The boss does not want that the nasty warehouse worker requests a Porsche which is then ordered by the careless buyer..

Anyone can be a requisitioner, but they are only allowed to request something within a certain value range, within the environment of their responsibility. Anything exceeding the defined threshold has to be approved by their supervisors. Some values may even require multiple approvals.

The release code in SAP is the electronic signature replacing the handwritten approval on a paper based process.

 

 

In my research for this blog I found numerous documents with SAP screenshots, all started right away with the SAP customizing. My projects start differently and the most time and effort is spend prior to the activities in SAP. We are doing Web meetings, the responsible person from business explains what they want, and the SAP expert tells what can be done. We also have different solution sets which are introduced by the SAP expert.

In general we want reduce the many variants and strive for a single release strategy that can be used anywhere in our global company.

Sometimes we even say "No - this is not the way we want a release strategy in our system". We have to think about the maintenance costs. If the release strategy is built on strange requests then the costs may explode later. An example: One exotic plant wanted the release strategy based on the user. If it is user Smith then a 2 level approval, but in case of Mr. Hoffmann only one approval by the plant manager is needed. In this example is nothing really generic, and with each change of a user the strategy would need to be amended.


Here are 4 strategy variants as example for a release strategy on purchase requisitions:

1

No approvals required

If you are authorized to create a requisition, it will be sent directly to Purchasing without review.

2

Two approvals required for all requisitions

Any requisition, regardless of dollar amount, has to have two levels of approval before going to Purchasing.

3

Approval determined by dollar amount 
--> Option A

< $500 - no approval required 
$500 - 2499 -- Level 1 approval 
> $2500 -- Level 2 approval

4

Approval determined by dollar amount 
--> Option B

< $2500 -- Level 1 approval 
> $2500 -- Level 2 approval


and a picture with the same information plus one more variant:

 

ReleaseStrategy1.PNG

ReleaseStrategy2.PNG

And this was just a small set of examples for release strategies on purchase requisitions. I can just recommend to create a  strategy on release strategies to avoid too much variations. Some can be much more complex and could only be understood by the single developer, and you get in trouble if this developer is not with you anymore, like in this more complex requirement.

ReleaseStrategy3.PNG

As you probably know from the documentation you can have release strategies on requisitions, on purchase orders, contracts and schedule agreements, RFQs and Service entry sheets.

Here is a variety of documents in SCN, many unfortunately have more pictures than words, and do not at all emphasize on critical parts like item based characteristics in header strategies.

Release Strategy configuration for Contracts and Purchase Order

MM-SRV Release Strategy for Service Entry Sheets - ERP SCM - SCN Wiki

Multi Level Purchase Order Release Strategy

 

a better one with a good Q+A section at the end

Setting up Purchase Order Release Strategy

and a jewel among all, unfortunately not much recognized since it was uploaded at SDN times and you need to click the link within that document to see the good work:

Release Strategy Enhancement in Purchase Order

(take the chance and rate the documents while you review them)

 

 

Why a release strategy for requisitions AND purchase orders?

 

The buyer could be corrupt and orders at higher prices. The difference to the normal price is then shared between the sales man and the buyer. Not fictive, it happened in the 80s. That is a reason that even purchase orders need to be approved before they are send to the vendor.

If the approver is really capable to identify such fraud is another story, but the example with the Porsche from above certainly is.


If you can trust your buyers, and only want the requisitions be approved, fine, then you an save some work.

It could also be turned, instead of doing a strategy on requisitions you could only implement one on purchase orders, because that would be enough to catch the case with the Porsche.


Best you know what your internal auditors want, or you even invite them to the meetings, as this can reduce double work in design and realization.

 

Do you use contracts, wonderful you can generate money for IT, they can have a release strategy too.

What I actually wanted to say, in that case you may want to avoid an approval of the purchase order if the contract is referenced.

But this is only possible with a user exit where you add coding to check this circumstance.

 

 

complicated approval processes need more time

 

Another topic in the meetings is to talk about the approval process in general. How long does it take to approve a document, how long in case of high complex strategies with the maximum of 8 levels. This time needs to be covered with the purchasing processing time (update customizing or include it into th planned delivery time of material masters). Make them aware that just one approver is a bottleneck, a substitute for vacation and other eventualities is needed otherwise you can't order anything if the approver enjoys beach life and is bitten by a shark on his last vacation day.

Hey developer, stop and think: If you have several possible approvers, does it make sense to put the name of this approver into the strategy?

A clear NO.   Instead of name that may change once per year use something generic like >20000$ approver or plant manager instead of Mr. Bill.

People often ask for the maximum approval levels - I guess this is interview or certification question - the answer is 8 approval levels, but nobody seems really be interested why you can't have more. Of course it is caused by the SAP design, table T16FS has only 8 fields for release codes. And the release status field (e.g. EBAN-FRGZU) has a length of 8 characters. This fields is filled with Xs for each approval level. This single field is the basis for the display of the  status overview: http://scn.sap.com/servlet/JiveServlet/showImage/102-49987-2-338607/ScreenShot.jpg




Header level strategy


What else needs to be defined in the meetings?

In case of requisitions you need to define whether your strategy is at item level or header level.

People are creative, they may dismantle the Porsche and order 4 wheels, 2 Recaro seats , 1 motor ...

With item level strategy they may stay below a threshold and would not need an approval.

In purchase orders is anyway only a strategy at header level possible. Since you can only send a purchase order as a whole document to your vendor, because there is no message determination at item level either.

 

However, you must not forget that you get other challenges with a header strategy.

You know that purchasing documents can have several items. So you can have items for different cost centers, items with different material groups, even items with different plants are possible in one document.

In case of a header strategy you cannot have approvers at plant  or cost center level, except you restrict the creation with a BADI and allow only items from one plant or from one cost center in one document. Standard customizing is not able to restrict this, the BADI or exit is needed.

If you are fine with a header level strategy and approvers by dollar level, no matter for which cost center the items are ordered, then you have to prepare your classification accordingly otherwise your release strategy will not trigger.

An example: in a header level strategy the values from the items are summed up. If you have a plant as a characteristic in your release classification, then the plants from item level are as well "totaled" :  Assume you have 2 items, item 1 for plant PL01 and item 2 for plant PL01, then is is quite as PL01 + PL01 = PL01 . But if item 1 is plant PL01 and item 2 for PL02, then the situation is like this PL01 + PL02 = "blank" . And exact this values need to go into your classification otherwise the strategy is not executed.  Your classification needs for the characteristic plant: PL01 PL02 and blank as value.

This is valid for any field from item level that is used in a strategy at header level. And I have not seen a single document in SCN where this is explicitly shown, but it is seen in the questions quite often and it is said in various wikis and KBAs and OSS notes.

 

 

Draft on paper

 

The result from our meetings is usually a Business Blueprint  and the strategy on paper (in Excel) which can be used as functional specification

Here is an example for a strategy based on cost center by dollar limit. The upper part (Row 1 - 6) is our strategy definition, the lower part (Row 20 - 34) is the mapping to the user roles

Release strat.PNG

 

Based on Cost Centers (column B) we defined the release groups (column A)

A release group can have just one or many cost centers.

In the example you can see that cost center 98111, 98112 and 98817 belong to the same release group SA

Based on the dollar value we defined the approvers and the  release codes.

Example in column G and H (both columns belong together), Purchase requisitions up to $ 20000 have to be released with release code SC (visible in cell H2)

For each combination of release group and release code we need a strategy code. (for example AC in cell H3 is the strategy for combination of release group SA and release code SC)

For each combination of release group and release code a role is created. (for example role YPSCPX34..  in cell C27  is the role for combination of release group SA and release code SC)

In Cell I27 you can see the description of the role, there is no hint to a dollar value or release group and code.

 

As you see in the Excel spreadsheet, there are actually 2 parts, the upper part is used to setup the strategy in customizing.

The lower part is used to define the user roles and to assign them to the approvers.

 

There is no easy link between a user and a strategy. There is usually a n:n relation. There is no report in SAP that can tell you who will be the approver for requisition x.

You would need to obtain the release strategy from the document, look into the customizing to find the release group and code for this strategy  and finally look up the roles which have this combination of release group and code and to which user they are assigned. Sometimes I am asked to check which user is holding up the process. Then I torture myself with SE16N and SUIM transaction to find the potential candidates. It is much easier if the Excel spreadsheet is kept alive and is updated regularly.  Of course an ABAP report would be welcomed. Often requested in SCN, but nobody ever came back to share his program.

 

With a workflow implemented it is possible to see at which user the workflow  currently is.


A little easier is to know who actually approved a document, because this info is stored in the change log (table CDHDR and CDPOS), still there is no report to list this for a number of purchasing documents.

 

 

Release strategy without classification

 

This is the remnant from R/2 times and only possible for purchase requistions. The release strategy with classification came with R/3 in 1996. But maybe you have no complex requirement and a strategy based on plant, material group and value is just enough for you, then you may want to look into this document for the setup:

Setting Up Release Procedure for PR without classification.

Since the release strategy with classification can be setup for the same criteria you should better use this way instead of spending time learning an out dated method.

 

 

No changes

 

Coming back to the design meetings, make it clear that the outcome should be a strategy which can be used long-term and is not subject to continuing changes and "improvements". Better improve your preparation.

Changes in a release strategy are not recommended if this strategy is in use and will lead to errors. Create a new strategy, never delete existing strategies. Have no open documents unapproved if you are going to change anything.

Read KBA 1635346 - Add a new release code to the release strategy of PR issue

If you really need to change, then it is very important that you do it in the right sequence.

Deletion of Existing Release Strategy in SAP ECC

Just deleting the release group does not make the depending customizing going away. It is more like beheading a chicken, it can still run through the yard as some videos in Youtube show. However, the SAP customizing is still there and troubles you for more than a minute. Technically it means you have still data in table T16FS, which is the table that stores the release codes to a strategy. This table has the key fields release group and release strategy.

So you can have several entries with the same release strategy. This actually happens frequently after a deletion and new definition, the numerous discussions are evident. The problem is that SAP does not search for a record by the combination of release group and release strategy, it only searches with the strategy, so you have to make sure that the strategy number is unique and exists just once in that table. Otherwise SAP will take just one and this may have a release code that is not covered in any role and nobody can release your document.

 

ClientRel. GroupRel. StrategyRel. Code 1Rel. Code 2Rel. Code 3Rel. Code 4Rel. Code 5Rel. Code 6Rel. Code 7Rel. Code 8
800AA010604
800BB0101<<< THIS IS AN ISSUE
800CC0201


Check your customizing with OMGSCK to ensure it is consistent and error free before you  test it or even release it for production.




Workflow

 

Further you need to decide if you want to make use of a workflow. This means that the purchasing document is directly routed to the approver(s).

Any extra feature has advantages and disadvantages. An advantage is certainly that a manager get an email when a new document is waiting for approval and does not need to execute release transactions in SAP to see if there is anything to approve.

A most common error is that the person who gets the workflow has not the roles to approve the document. Workflow for approval does not replace the user roles. It is your developer task to keep roles and workflow synchronous. The workflow requires  discipline by the users.  When you decide to go for workflow, then make it clear that the people execute the release through the workflow only. The workflow is an extra process which stays open if you use the normal transactions to release the documents. So you have extra work to end the workflow.

If the workflow is made on individual users instead of groups then the users have to activate a forwarding rule to their substitute  in SBWP Business workplace transaction when they take vacation.

Blogs an documents related to release strategy and workflow in SCN are

SAP MM: Purchase Requisition with Classification and Workflow Approval

Work Flow Mail Generation for Release Procedure in Sourcing Module

Release strategy Vs Workflow release of purchasing documents

in the modern world you even approve with tablet computers and smartphones:

SAP FIORI : Approve Purchase Contract App

Online Purchase request (PR) Approval Application Using Blackberry

A workflow Application to Release A Purchase Order...

 

 

Multiple currencies

 

Purchase requisitions are internal documents which either take the value from material master, or if there is no material master the user is forced to enter a value as estimate. This value is always in the value of the company code.

A purchase order is an external document which may have the value in your vendors currency.

Your release strategy  can be defined to be used in several companies around the world with different currencies.

All these case may require to define a release strategy with multiple currencies.

See the SCN content on multiple currencies:

Use of multiple currencies in Release Strategy - ERP SCM - SCN Wiki

Purchasing Doc. Release with Multiple Currencies

Multiple Currencies in Purchase Order Release Strategy

and the official KBA: 1739381 - Multiple currencies in purchase order release strategy needed

 

 

Transport Strategies

 

Transport of release strategies is not easy as a release strategy with classification is a mix of customizing and master data (classification) and eventually even program coding if you make use of the exits.

Please read OSS note 86900 - Transport of Release strategies (OMGQ,OMGS)

Master data is usually not transported and need to be created in QA and PRD systems again manually, which is a source for errors too. An way out is to use ALE distribution for the classification. You have to decide yourself how much data you would need to maintain manually again and if ALE can save you time, or just creates another complicated hurdle.

Beside of many discussions we have 2 documents on transporting of classification:

Characteristic value movement across Systems through ALE in Release Strategy Implementation

a better one (my personal view): Transport of classification across systems/clients - Quick Reference

 

 

ABAP to close the gap between standard and business requirement

 

The user exit for release strategies was already explained in Release Strategy Enhancement in Purchase Order

Still there might be other requirements that are not foreseen by SAP, here are a some documents and blogs explaining some special developments

Release Strategy: Restrict lower users to revoke PO after the complete release by superior

From the ABAP space, but you should be able to read ABAP, as some developers are not able to describe it for non-ABAPers  How to Reset Purchase Order Release Strategy

Sending  EMail Notification when PR is released from ME54/ME54N/ME55

if you have so many strategies and you need to load them instead of doing customizing: Mass Upload of Purchase Order Release Codes and Release Strategies - A Function Module Approach

 

This document closes the knowledge gap between functional and ABAP world, worth to read it from both parties:

Triggering of release strategy for a Purchasing document – a developmental overview

 

 

 

Printing purchase order with release strategy

In SAP standard it is not possible to print a document which is not approved. This makes sense, otherwise you could submit a document which is legally binding to your vendor while you did not have the approval. Of course there are ways with ABAP methods to get around this restriction, in that case you have to take organisational measures to avoid sending this document. Or the ABAPer programs it to print with watermark "DRAFT" . If your document prints while it is not fully approved and it is not wanted, then call your ABAPer as it is a homemade problem.

more background is given in OSS note 61871 - Output of messages and release strategy

In case of email and fax the last approver will be used as sender (hence he need to have a valid email address in his profile).

There is a SAP note with a modification to change this behavior: 561593 - Sender of the message (fax and/or email) is wrong.

 

 

 

Other valuable content  and important SAP notes

 

Rahul explains his findings when working with different scenarios in Release strategies

Release Strategy Scenarios

 

this wiki gives design insight regarding deleted documents in regard to release strategies

Release Strategy with deleted Purchase Requisition and Purchase Document - ERP SCM - SCN Wiki

 

I have not seen many questions on release strategies with purchase orders on hold, but it was nice to read the background of the design in

KBA 1981241 - Missing release strategy tab for purchase orders put on hold

 

Some more questions were posted recently about release strategy and version management, here are 2 KBAs on that:

Release strategy with Version number:

1961482 - Reset release strategy when version number is set as Characteristic in Customizing

1961585 - Release strategy is not triggered when Version number is set as a Characteristic

 

 

 

Make sure you have gone through the FAQ notes before  you post a question in SCN:

16 question and answers in OSS note 493900 - FAQ: Release Strategy

some more in OSS note 365604 - FAQ: Release strategies in purchasing

and 10 more on services in OSS note 672719 - FAQ: Release strategies in the service

and a SAP given PDF documentation in OSS note 207490 - Release procedure purchasing: Documentation for Customizing

 

Please never miss to read the related notes that are mentioned at the bottom or in the text of these notes.

 

 

 

Analyzing issues and errors

 

If you have studied all referenced content above then I actually do not expect any more errors and issues. But you may have overlooked an important information or you really have a new problem.

There is a SCN blog with a check list in case of issues and as well a KBA in the market place and many wikis in SCN

MM - Check List to detect and solve Release Strategy Issues

1497235 - Release strategy is not determined for Purchase Requisition in t-code ME51(N)/ME52(N) or Purchase Order in t-code ME21(N)/ME22(N)

Check List to detect and solve Release Strategy Issues - ERP SCM - SCN Wiki

Why is no release strategy determined - ERP SCM - SCN Wiki

 

Beside of that explicit mentioned content we have 6500 discussions for release strategy. Here you should search to see if your issue was already addressed before you create a question.

 

But if you create a question, then please not a one-liner like this: "My Release condition is in PO level,when i am creating PR and converting to PO the release procedure is not working at PO level."

 

This sentence has almost no information to work on. What does "not working" mean? is there an error message? does the strategy not trigger? It is not told on what criteria the release strategy is built and no evidence that the data entered matches with this setup.

 

A release strategy can be compare with this geometry brick box for children (2-4 years old). The box is your customizing, the bricks is the data in your document. This has to match exactly, and when all your bricks at put into the right holes, then the release strategy triggers.

 

intelligenzrelease.PNG

Hence if you a problem, give information about your box and show us the bricks, but do not present and empty image:

empty.PNG

CHANGE_MDPSX_MSSL and MD_SUBCONT_LOGIC

$
0
0

Hello

 

May I know what is the different between BADI MD_SUBCONT_LOGIC and the method of CHANGE_MDPSX_MSSL under BADI MD_CHANGE_MRP_DATA?

 

 

It seems if I want the SAP MRP to consider Subcontracting Stock (i.e. generated via movement 541) as part of available stock during MRP, I can make use of either of the above BADI, but which one is the correct BADI to achieve this?

 

 

Using MD_SUBCONT_LOGIC has a downside in which if I want to switch to Simple logic it has the following implication:

 

 

This logic is generally of use for components to be provided that are specifically assigned to one subcontractor. If several subcontractors are involved, this has the undesired effect that in planning, the stock of material provided is drawn from a distant vendor to cover another vendor's requirement of material provided.

 

 

As such, may I use BADI MD_CHANGE_MRP_DATA  of method CHANGE_MDPSX_MSSL to achieve this requirement?

 

 

Please refers to a forum (http://scn.sap.com/thread/1440341)

 

Regards,

Tuff

STR/STO or MRF?

$
0
0

Dear All SAP Experts,

 

Appreciate your advice on what are the best transaction should be used for business process as the following:

company code A to company code B, with all charges to be absorbed by company code B under a particular G/L Account specification.

Either to user STR/STO or MRF?

 

Thank you.


Mail to vendor on posting a GR

$
0
0


Hello Experts,

 

I have gone through the existing posts in SCN for the configuration of mail to vendor upon GR posting but still not able to get the desired result.

 

Mail did not get trigger while posting GR. Need expert help to achieve this functionality.

 

BR,

Naveen DSouza

MIGO,MB1B, print indicator should be default

$
0
0

Hello

MIGO and MB1B transcations, print indicator is not selecting automatically. why?

background:

In user profile (SU01D), paramater NDR was maintianed correctly.

eventhough user is having NDR parameter, but he is not able to see the print indicator automatically??

in additioon , if they give manually print indicator for individual slip /collective silp, out is saved. and output is displayed in green color in GR iteam leavel "Message" tab.It means output setting are correctly maintained.

even i tested with my user id..if i dlete the NDR to my id, it is not working.

again i added NDR parameter, now it is correctly.

Question: In production already user was maintained with NDR parameter, but he is not able to see the print automatically.

 

so shall i delete his NDR parameter once  and add again?? this will be work or not ?? please confirm.

 

Regards,

Pabbati Obulesu


PL Val. GR Blkd St. exceeded

$
0
0

Hi,

 

I am having a PO with origin acceptance and order quantity as 60 MT. I have raised a GRN with movement type 107 for 60 MT. Upon the physical receipt of a material 2 GRN raised with movement type 109 for the quantity 20 MT each. Now I am trying to receive balance 20 MT with movement type 109 system is showing the error message "PL Val. GR Blkd St. exceeded by 3.000 KG : Material Plant Location Batch". Can somebody help me on this issue.

 

Abhishek

EINE-MINBM, message 06216 issued even for old PO

$
0
0

Dear All,

 

I know  that the PO quantity is checked against eine-minbm without any check for change date of this field (e.g. from a vendor a specific material has a minimum ordered quantity from 01.01.2015; the PO created before this date should be processed even for a quantity less the minimum one).

 

Is there any way to set the system in order to check the quantity time dependant?

 

Regards,

Florina Rau

How to change the number ranges for material Documents in OMBT

$
0
0

User has wrongly entered the number series for the current physical year in OMBT Transaction.Some material documents have been generated against the series.now i want to correct the number series with a different one.since the initial count is not zero system is not allowing me to change the number series.Is there any possibility to change the number series.