Quantcast
Channel: SCN : All Content - SAP ERP - Logistics Materials Management (SAP MM)
Browsing all 6446 articles
Browse latest View live

stock transfer plant to plant into blocked stock

Dear all,is there a away to do plant to plant stock transfer and have the stock go into blocked stock automatically in the destination plant. thank you

View Article


Modify Plant Code on Contract Plant Condition

Hello Everybody, I have a doubt on contract, during the definition of a plant condition. The user creates a contract (ME31K) and defines a plant for it, but if he need to change the plant code (by a...

View Article


PO - Acct Assignment

Hi All, We use the account assignment category  M and while creating PO from a Sales order. It used to hit a Balance sheet G/L account but for some reason/change it is hitting a P/L consumption...

View Article

Reference multiple documents in MM to print on PO

I need to find a way to have a part in the MM reference multiple techicinal documents that in turn will get printed on the PO. Currently just being handled in the Basic Data Text field in the MM....

View Article

Third party purchase unit of measure issue.

Hi Friend, I have created sales order for third party process unit of measure in sales order is in Meter  qty is 3.7 mater.But PR & PO id created in the unit of measure Piece i.e. 3.7 pieces.GR is...

View Article


ean has invalid prefix...ehp6 sap ecc6 version

Hi Experts, please regarding the sublect above..we have new products with EAN ex ..6923251810423, when maintaining it in material it computes the right last digit of  but encountering an error message...

View Article

To block vendor by usage

Dear Gurus, Is it possible to block a specific vendor or a range of them, if they are not used by a certain period? When I mention block, is to block for anyone to create a PO. Regards Oliver F

View Article

Image may be NSFW.
Clik here to view.

PR Release Error In Classification

Hi SAP Experts, When we doing configuration on Release Strategy Classification for PR. After creating Characteristic and Class, when we were already creating the Release Strategy Classification for PR,...

View Article


Image may be NSFW.
Clik here to view.

Define your own sequence for Text in Purchasing document.

Business Requirement:There are two types of text which are used in purchasing document. Header Text and Item Text.There is a sequence of these texts which is defaulted by SAP. As like asNow if business...

View Article


412Q Movement is picking Consumption G/L instead of Stock G/L

Dear Experts,When I am transferring project stock to plant stock in MIGO using 412 Q movement it is showing the accounting entry as below.. Consumption Cement Dr..Stock Cement Cr.. The account entry...

View Article

Creating a service report using SQVI

Hi experts I am creating a service report using SQVIThe report should have the following fielsSrvPO No | SrvPO Data | vendor | Stata  | City | Type of Srv (Ad\banner|maintnc.)  | Amount | Status(open...

View Article

Subcontracting without 57f4 challan

Dear Guru's  I have scenario , Industry is textile industry...  as product is non Excisable and going for subcontracting my doubt is. 1. as we are transferring material by mvt type 541 to vendor ,Is...

View Article

PO Price Variance Tolerance against Valuation Price

Hi Experts, I am tiring to turn on the configuration "Purchase Order -> Set Tolerance Limits for Price Variance" (for PE-Price variance: purchasing) as an error message.I am wondering about how its...

View Article


One PO for multiple company code

Hi,   I have one scenario,  we have two company code   X and Y,  now we want to purchase the UPS qty 1  and Battery qty 10, which will use by both the company now can we create one PO for both compnay...

View Article

About calculatin logic of amount in local currency (MSEG-DMBTR)

HI,Experts, I want to know calculation logic of amount in local currency (MSEG-DMBTR). Example: I create one material docment (movement type is 601).So I guess the calculation is as below:Amount in...

View Article


DOUBT ABOUT Automatic Postings while doing Mv Type 641

Hi Gurus, My client has a Stock transport Order between two plant and he is using a material withount Accounting View in its material masters, so the material does not have a Valuation Class. When he...

View Article

Transfer stock from unrestricted to subcontracting

Hi Guru, During stock upload, we did a mistake. The subcontracting stock was wrongly uploaded as Unrestricted stock and vice versa.Any idea how we can correct this ?  Best Regards,Anil

View Article


Image may be NSFW.
Clik here to view.

WBS Element Not Able Flow into Accounting Document

Hi All, Would like to have your help how can i configure the WBS Element Flow into the Accounting Document that was initially have WBS Element Field in TCODE : FBL1N. As per tested the WBS Element is...

View Article

Doubt in FI-MM integration (T code 'MM01')

Hello there, My Name is Jomon Mathew, I have a doubt in FI MM configuration (T code MM01) after I did the configuration and try to save, then I get the following error message Run time errors:...

View Article

close/delete some items in reservation

Dear All, I need to know how to set final issue or deletion flag for SOME items in many reservations (collectively) , while i tried MBVRit deleted the item from system and this is not the required....

View Article
Browsing all 6446 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>