Hi,
The estándar versión makes a Split in an Outbound delivery due to different Planned GI for each materail. I need to join all the materials selected a the same outbound delivery independently. There was a sap note (445162) by which you modify the dynpro that appears when you push Create Delivery, and add a date field to let join all the materiales selected in one Planned GI. But this note does't work after 4.5 reléase.
I have debugged trying to find where the systems determines the Planned GI value (WADAT) but, despite for some materials the WADAT fiels is the same, somewhere in the program, the system changes it.
I have read all the notes and posts with reference to Split in ME2O and I haven't found anything to achive this.
Please. I need someone brings me a solution or a link where I can find it.