Hi,
When creating a reservation from MRP with movement type 311, resb-lgort (storage location) is not filled, only resb-umlgo (sullpying/receiving storage location) is filled.
When creating a manual reservation with mt 311 this behaviour don't exist and both sl's are filled.
I have a requirment that needs both the supplying sl as the receiving sl in resb.
Which program of FM is used to create the reservation from mrp and is there a user exit or Badi I can use to fill resb-lgort?
Both storage locations are within one plant and in two different planning areas. Further more we don't use any planning components, MRP is only to replenish our stocks.
Thanks in advance!
Jorgen