Hi,
We have a scenario at our current legacy system under the process of subcontracting.
After making a subcontracting PO, Raw materials are sent to subcontractor and the subcontractor processes and provide us back the semi finished product which is further processed at our plant in order to make Finished Goods.
One Raw material is used in making different semi finished goods at the location of subcontractor.
Usually subcontractor produces some extra amount of semi finished goods which is kept at subcontractor location as left over. Subcontractor provides us the detail of left over stock available at his location for both Raw Materials and Semi finished goods. Next time while placing PO to the subcontractor we do calculation based on the left over quantities and send the quantity of Raw Material accordingly.
How to map this scenario in SAP?
The main point is can be track semi finished goods left over at Subcontractor to track the exact details of left over stock (both product &
components).
Can anyone provide some idea to resolve this?
Many thanks in advance.