Hi experts
We have to config a new plant (in India) in ECC 6.0 EH4, with MM, SD and FI modules. Considering the same kindly help in following.
1. Raw material will be procured through MM cycle but PP module is not being configured, So How the raw material will be issued and Finished Goods will be produced with appropriate accounting entries so that same can be sold (PGI with 601 movement)
thanks in advance