Dear experts,
Please could you please advise if it is possible to customize MRP in order to be runned as described :
We have Material 1 in Storage location 001, plant 100
The requirement is to have Material 1 in storage location 002, plant 100, through STO, else Purchasing.
Example :
Material 1 in Sloc 001, plant 100 : Quantity = 10
MRP generates need of 30 in Sloc 002, plant 100 : Quantity = 20
So here, i would like to have STO of quantity 10, then 10 of standard purchase order.
Thanks a lot of advise.
Cheers