We have the following master data settings:-
MRP Type- VB
Re Order Point- 100
Lot Size- HB - Replenishment to max stock
Max Lot Size- 20
Maximum Stock Level- 150
Planned Delivery Time- 5 days
GR processing time-1day
Planning run on 05.11.2015
System generated the eight schedule lines as below:-
11.11.15 20
11.11.15 20
11.11.15 20
11.11.15 20
11.11.15 20
11.11.15 20
11.11.15 20
11.11.15 10
Why the delivery date is same for all the schedule lines. My client wants it should be different as per planned delivery time.
How to achieve this.
Regards
Aman