Hi ,
I have a doubt and I need your advice.
I have changed the ABC Indicator percentage to 60,30 &10. I have also deleted the D indicator, but there are materials which are having D indicators.
Now when are running the batch input, MICN . Theyre not able to get any materials.
I wanted to know that since I have not maintained D indicator. This has resulted in the system giving an message of no material available for Cycle count.
So, if they maintain the D indicator or remove the D indicator for materials whether they would able to run the batch count.
Thanks,
Ravi