Dear All,
I know that the PO quantity is checked against eine-minbm without any check for change date of this field (e.g. from a vendor a specific material has a minimum ordered quantity from 01.01.2015; the PO created before this date should be processed even for a quantity less the minimum one).
Is there any way to set the system in order to check the quantity time dependant?
Regards,
Florina Rau