Hi,
Can be possible, Asset link with spare Material Master in plant level? Or Material link with Asset Master. Because one Asset against more than 50 spare part materials are there and using base on Plant level.
At present can’t be link between the materials with Asset that why not identify, which we buy the Spare material.
Devendra