MRP create schedule line because of an order on the substitution date

$
0
0

Hello all,

 

I read this forum since few years and always found something to help me, but this time, nothing.

 

I have 2 AC in substitution

 

AC1 (old AC)

Follow up date : 13.03.2015 to AC2

Planning Calendar : W02

Minimum lot size : 50.000

Safety Day : 1 Day

 

AC2 (new AC)

Planning Calendar : M01

no Safety Day

 

As you can see there is a ScheduleLine placed before the substitution.

But why ?

DepReq on 13.03.2015 must consume all the AC, and after it's the new AC to be consume no ?

AC1.jpg

AC2.jpg

We have do a lot of tests and if we move the substitution date to 1 day before or after, calcul seems to be correct. Same thing if we remove the safety day on AC1