Hello all,
I read this forum since few years and always found something to help me, but this time, nothing.
I have 2 AC in substitution
AC1 (old AC)
Follow up date : 13.03.2015 to AC2
Planning Calendar : W02
Minimum lot size : 50.000
Safety Day : 1 Day
AC2 (new AC)
Planning Calendar : M01
no Safety Day
As you can see there is a ScheduleLine placed before the substitution.
But why ?
DepReq on 13.03.2015 must consume all the AC, and after it's the new AC to be consume no ?
We have do a lot of tests and if we move the substitution date to 1 day before or after, calcul seems to be correct. Same thing if we remove the safety day on AC1