Hello gurus,
I am trying to achieve this: We have one plant with two storage locations. There is one material stored in both locations.
Now I would like MRP to handle both storage locations independently, i.e. for example:
We define reorder point to 50 in locations A and 100 in location B. Let’s say, stock in A is 40 and 150 in B.
Now I would like MRP to create a PR for storage location A, because stock is below reorder point.
Is that possible in standard? I put SLoc MRP indicator to 2 in both storage locations but that only creates a stock transfer reservation from location B to A.
Cheers
Alicia