Hi Experts,
In our company, in Sub contracting process, if I have 2 BOM having same name, while doing PO, which BOM system will Pick?
regards,
babu
Moderator message: Discussion locked: Basic question. It is explained in help.sap.com and 54 times in SCN MM space.
Here again the link to our forum rules, even you got it more than 10 times already: http://scn.sap.com/docs/DOC-19331
Message was edited by: Jürgen L
Message was edited by: Jürgen L