Dear Experts,
I have a requirement for one of my client, where client want's PO should triggered for release to Separate Release Code if the line item (Material) price is GE 10% in current PO.
Existing PO Release Strategy:
1. Current PO Release strategy is configured with the GNETW, EKGRP, WERKS characteristic Combination.
2. Strategy 1 is triggered if PO Price is LT 5 Lakh. Release Code assign for the same is 12: Purchase Executive, 14: General Manager,
3. Strategy 2 is triggered if PO Price is GE 5 lakh. Release Code assign for the same is 12: Purchase Executive, 14: General Manager, 09: Chief Executive Officer.
4 Release code 99 Special procurement manager need to triggered for required scenario, if Line item Price is GE 10% from last 8 released PO for the same material. (Please refer attached document).
Standard Scenario.
In any case PO should be release by code 12 at 1st level. In normal scenario 2nd level of release code 14 should be triggered.
Reqirement.
Once 1st code 12 release the PO and, if line item price is GE 10% then 2nd release code should be code 99 Special procurement manager.
Can any one give some light on this.