PO Release should be triggered to specific release code if Current PO Material price is GE 10% from last 8 PO.

$
0
0

Dear Experts,

 

I have a requirement for one of my client, where  client want's PO should triggered for release to Separate Release Code if the  line item (Material) price is GE 10% in current PO.

 

Existing PO Release Strategy:

 

1.      Current PO Release strategy is configured with the  GNETW, EKGRP, WERKS  characteristic Combination.

 

2.      Strategy 1 is triggered if PO Price is LT 5 Lakh. Release Code assign for the same is 12: Purchase Executive, 14: General Manager,

 

3.      Strategy 2 is triggered if PO Price is GE 5 lakh. Release Code assign for the same is 12: Purchase Executive, 14: General Manager, 09: Chief                  Executive Officer.

 

4  Release code 99  Special procurement manager  need to triggered  for required scenario, if Line item Price is GE 10% from last 8 released PO for the same material. (Please refer attached document).

 

Standard Scenario.

 

In any case PO should be release by code 12 at 1st level. In normal scenario  2nd level of  release code 14 should be triggered.

 

Reqirement.

 

Once 1st code  12 release the PO and, if line item price is GE 10% then 2nd release code should be code 99 Special procurement manager.

 

 

Can any one give some light on this.

 

 

Thanks in advance.

SKN


Viewing all articles
Browse latest Browse all 6446

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>