Dear Experts,
I would like to set my MRP for material purchases in order that I can have 2 different lead times, depending on the route (air/sea)
For instance, if MRP can supply enough material with 1kg or less, then it should take a shorter lead time for it would be air freight than if the minimum necessary was more than 1 kg. (Actual freight lead times= air 60 days, sea 90 days)
Best regards
Marco Aramini