Hi,
I'm creating a new condition type and it should be maintained in MEK1/2/3.
The new condition type is copied from RUC1.
According to the business requirement, I have set REST as the access sequence to the new condition type.
Requirement;
1. The condition record should be determined by vendor
2. The validity period will not in use (i.e. 1900/01/01-9999/12/31)
3. The unit of measure of the material to be purchased can be either PCE or PR
Issue;
It seems I can create a condition record per one vendor per only one UoM.
I have create a condition record for PCE, and set a scale 1PR = 1PCE for that condition record.
However, when I've tried to create a PO, I've got a quantity conversion error.
Does any one know how I can configure the 2 UoM for one vendor?
Restriction;
The material master is shared with other companies.
Therefore, we cannot maintain material master for this local requirement.
It has to be managed only by configuration.
Your help would be much appreciated.
Best Regards,
Mari