Hello everybody,
I am facing some problem in goods movement and expect some views in the following scenario.
Having a problem in PARALLEL goods movements when multiple users perform any of these pair of transactions
(PGI with GR),
(GR with GR),
(GR-PGI-PPorder confirmation)
The system generates message M3682 'Batch & of material & is already locked by &'.
We are facing this transaction blocks very frequently.
The common factor in all these transactions is the batch name 'OK'.
Till now the material lock (OMJI) was "EXCLUSIVE LOCK", i had tried to simulate with activating "LATE LOCK" also, but the same error M3682.
Please spare some time in analysing this scenario. Please let me know if you need more details.
Thanks & Regards,
Joy Ghosh