Hello all,
I am wondering if you can provide some guidance on the following question.
I have a project which will go live on Jan 2015, and we use cycle counting method for our process.
- Question: 1 - Does the business is require and need to provide us the ABCvalue for each material so that for us to load the MARC-ABCIN during material master migration?
- Question 2 - If business not able to provide the ABC indicator, I am wondering if business can provide a default value like (B) for all the material records for us to load. After that, we perform the MIBC transaction to create the ABC entry into the material master after project live? If the answer is "yes" on this question no.2, there seems to have a problem on using MIBC as when I run this MIBC using the "consumption/usage" with one year range, and there is a problem because there is no A, B, nor C value generate for the material on our first migration loading mock testing. I got the message ("Total value = 0, no analysis performed. Message no. LC255") after running the MIBC.
BR,
Daniel