Hi gurus,
I was wondering if someone could throw some light on this strange behavior. I tried to check all settings and it did not make any sense to me. we have a material A and material B. material A is the component in the BOM of Material B. We get sales orders for material B. I see in the document flow of sales order of material B that it was PGI'ed yesterday and we have MRP job NETCH that runs everynight. I do not understand why the MRP element with CUS ORD still shows up in MD04 for material B and as a result the dependent requirements also shows up for material A in MD04. what could be the problem. Oh and by the way we use strategy group of 52 on the material master for B.
Any ideas?
Thanks
Ravi