Material for Multiple Storage Location under one plant

$
0
0

Hi

 

We have created a material for multiple storage location under one plant. As material is created for multiple storage locations, so it can be received and issued from any store. Due to this reason, we are not maintaining any storage location data / information in MRP2 view of material master. However, we maintained this information in BOM. After the MRP run, system creates an PR (as per requirement), but this PR does not contain the storage location number (field LGOBE), which is maintained in BOM. The field is blank.

 

How to populate this field from BOM ? We are using ECC 6.0 EHP5.

 

 

Regards


Farhan