Hi,
Please guide me for the following query:
We have scheduled the MRP process in the background through transaction
code MDBT.
The parameters which were passed during the scheduling are as follows:
Plant 0002
Processing key NETCH
Create purchase req. 1
Schedule lines 3
Create MRP list 1
Planning mode 1
Scheduling 1
Planning date 05.12.2013.
Variant name:ZMRP_NEW.
For Material Code P1S002, the reorder point was set as 200 and the
Maximum Stock level was set as 500.
The Lot size is set as 'HB'.
MRP Controller is set as '001'.
MRP Type is set as 'VB'.
The stock level was '0' at the time of execution of MRP Process and two
Purchase Requisition were already created with quantity 195 but still
new Purchase Requisition was not created by the backgroup MRP process.
And the same is got created when the MRP process was run as dialog
process. Please guide me about this problem.
Thanks and Best Regards