Hi Friends,
There is one inbound delivery which is having SLED date that is before manufacturing date. On Material document created for this inbound delivery is having correct SLED date i.e. after manufacturing date. In LT24 for this TO I see that SLED date is of past . same as date as inbound delviery SLED date.
There is one job which run every night for program RLLQ0200 in which it checks whether maternal is expired as on todays date and change the stock category from unrestricted to quality inspection. This program has take above mentioned batch even if I see that SLED in MSC3N is of future date.
what should I do to not to take above mentioned batch by program RLLQ0200 as this mateiral is having future SLED in MSC3N.
Thanks,
Kiran